PM Kusum Scheme: Objectives, Components, Subsidy, Who will Apply

What is PM-KUSUM Scheme?
The PM-KUSUM or Pradhan Mantri Kisan Urja Suraksha Utthan Mahabhiyan scheme is an initiative launched by the Government of India under the aegis of the Ministry of New and Renewable energy (MNRE) in 2019. The scheme’s objective is to provide assistance installing off-grid solar pumps on village land (rural areas) and thus decrease their dependence on the grid. It is valid for grid-connected areas.
The idea is to increase farmers’ income by selling extra electricity generated and reducing the over-dependence of farmers on diesel. The scheme was launched by the Ministry of New and Renewable energy across the nation.
Name of Scheme |
Kusum Yojana |
Launched by |
Former Finance Minister– Arun Jaitley |
Ministry |
Ministry of Agriculture & Energy |
Beneficiaries |
Country farmers |
Major Benefit |
Providing Solar irrigation pump |
Scheme Objective |
Solar Irrigation pumps at Discounted prices |
Scheme under |
State Government |
Name of State |
Pan India |
Post Category |
Scheme/ Yojana |
Aim of the KUSUM Scheme
Through this scheme, the government plans to add 25,750 MW of solar electricity by 2022. The Central government plans to infuse Rs. 34,422 crores in this scheme.
Objectives of the KUSUM Scheme
Under the scheme, farmers, cooperative societies, farmers-cooperative groups, and panchayats can apply to install solar pumps. The total cost incurred in implementing the project is so planned that the farmers’ financial burden is negligible. The overall cost is divided into three categories:
- Government to provide a 60% subsidy directly to farmers
- 30% will be provided through soft loans to farmers
- 10% actual cost to be incurred by farmers.
Components of PM-KUSUM Scheme
There are three main components of the KUSUM scheme:
- Component A – The scheme plans to add 10000 MW of Renewable power by establishing individual renewable power plants up-to 2 MW size. These power plants are to be decentralized, ground-mounted, and connected to the grid. These are to be set up on barren land and should come up within a 5km radius of the sub-station.
- Component B – To install, 17.50 lakh standalone off the grid Solar Powered Agriculture Pumps with an individual capacity of the pump up-to 7.5 HP. It is meant to replace existing diesel pumps already in use. A farmer can install a higher capacity pump, but the financial assistance will only be granted to a 7.5 HP agriculture pump.
- Component C – To solarize 10 lakh on-grid or grid-connected agriculture pumps with individual pump capacity up-to 7.5 HP. The excess electricity generated from these plants will be sold to the respective DISCOMS on pre-fixed tariff bases.
How to implement the KUSUM scheme?
For implementing the KUSUM scheme, the State Nodal Agencies of MNRE will coordinate with respective States/UTs, Discoms, and farmers.
The components A and C under the scheme are to be implemented only in Pilot mode until 31st December 2019. On successful implementation of the Pilot project, the two components of the scheme will be further scaled up, after receiving necessary approvals.
Component B of the scheme, an ongoing sub-program is to be implemented in its entirety without any requirement of a Pilot project.
Implementation
Component A:
- Individual farmers, farmer groups, panchayats, cooperative societies, or farmer producer organizations can set up renewable power plants with 500 KW to 2 MW capacity. In case of failure to arrange funds, the above entities can collaborate with interested developers or with local DISCOMS to establish renewable power plants.
- Once operational, the DISCOMS will notify regarding sub-station wise surplus power that can be fed to the grid through these renewable projects.
- The surplus renewable power thus generated will be purchased on a feed-in tariff basis by local DISCOMS. The tariff is to be determined and fixed by the State Electricity Regulatory Commission.
- The DISCOMS are eligible for Procurement Based Incentive (PBI) @ 40 paise per kWh or Rs 6.60 lakh per MW installed capacity per year, whichever is lower for five years.
Component B:
- For standalone power pumps with 7.5 HP capacity, central financial assistance would be 30% of the tender cost or benchmark cost. The State government will provide a 30% subsidy, and another 30% will be arranged for farmers through Banks in the form of loans. Farmers will chip in with only 10% of the actual cost of the project.
- In the North East, Himachal Pradesh, Uttarakhand, J&K, Andaman and Nicobar Islands, the Central assistance will be 50% of the tender cost or the benchmark cost, while 30% will be in the form of subsidy provided by State government. The rest 20% will be arranged by the farmer with loans up to 10% by banks and farmers, putting in 10% of the actual cost.
Component C:
- The financial assistance provided to farmers in this grid-connected agriculture pump will be similar to component B. 30% cost will be CFA. In comparison, another 30% by the respective State government and out of rest 40%, Banks will provide loans for 30%, and the farmer has to arrange only 10% of the project’s cost.
- For North-east, Himachal, Uttarakhand, Andaman & Nicobar Islands, 50% project cost will be funded by Central government, rest 30 % by State, and 10% cost is to be given as loan by banks. The farmers have to bear only 10% of the project cost.
Beneficiary
The scheme aims to provide stable and continuous income to farmers or rural landowners for 25 years. It will be put to good use of the barren or uncultivated land. In the case of cultivated land, solar panels are installed at a height that doesn’t disrupt farming.
While providing a regular supply of electricity during the day to agricultural land, the close vicinity of the projects to sub-stations ensures low transmission loss to DISCOMS. It will wean away farmers from using diesel, another positive or win-win situation for the environment and the economy.
To increase farmer’s income and reduce their over-dependence on diesel, the KUSUM scheme was launched. The scheme puts to use the barren land in rural areas and cultivable fields for producing renewable energy. With the government’s financial assistance, both State and Central, the farmers’ financial burden is kept to the minimum. The KUSUM scheme can transform the rural economy for the better and improve the economic conditions of the farmers substantially.
Component wise Details of sanctions &State Implementing Agencies (2020-2021)
State |
Component-A |
Component-B |
Component-C |
|||
Implementing Agency |
Sanc. Capacity |
Implementing |
Sanc. Quantity |
Implementing |
Sanc. Quantity |
|
(MW) |
(No.) |
(No.) |
||||
Chhattisgarh |
No Demand |
– |
Chhattisgarh |
20000 |
No Demand |
– |
Delhi |
BSES –
Rajdhani
Power Ltd. |
10 |
No Demand |
– |
No Demand |
– |
BSES
– Yamuna
Power Ltd. |
||||||
Tata Power
– Delhi |
||||||
Haryana |
Uttar Haryana bijli |
25 |
Department of New and |
15000 |
Department of New and |
468 |
Dakshin Haryana bijli |
||||||
Himachal Pradesh |
HP govt. Energy |
10 |
Department of
Agriculture, Govt. of HP |
550 |
No Demand |
– |
Jharkhand |
Jharkhand bijli Vitran |
10 |
Jharkhand Renewable |
10000 |
Jharkhand Renewable |
500 |
Gujarat |
Gujarat Energy |
40 |
Gujarat Urja–Vikas |
4000 |
No Demand |
– |
Karnataka |
Bangalore Electricity–SupplyCompany,
(BESCOM) |
50 |
Karnataka Renewable |
6000 |
No Demand |
– |
Hubli Electricity –Supply |
||||||
Mangalore Electricity–SupplyCompany, (MESCOM) |
||||||
Chamundeshwari
Electricity–Supply
Corporation Ltd. (CESC) |
||||||
Kerala |
Kerala State–Electricity |
10 |
|
– |
TBD |
5200 |
Madhya |
Madhya Pradesh |
100 |
Madhya Pradesh |
25000 |
Madhya Pradesh |
15000 |
Maharashtra |
Maharashtra State–ElectricityDistribution |
300 |
Maharashtra Energy |
30000 |
Maharashtra State–Electricity |
9000 |
Manipur |
No Demand |
– |
Manipur Renewable
EnergyDevp.agency
(MANIREDA) |
20 |
Manipur Renewable |
80 |
Meghalaya |
TBD |
10 |
TBD |
1700 |
TBD |
60 |
Odisha |
No Demand |
– |
Orissa Renewable–Energy |
2500 |
No Demand |
– |
Punjab |
Punjab Energy |
30 |
Punjab Energy |
4500 |
Punjab Energy |
3900 |
Rajasthan |
Rajasthan Urja |
325 |
Horticulture Department– |
25000 |
Jaipur Vidyut–Vitran |
12500 |
Tamil |
No Demand |
– |
Agricultural Engineering |
17500 |
TamilNadu –
Energy |
20000 |
Tripura |
Tripura State–Electricity |
5 |
Tripura Renewable–EnergyDevelopment Agency, (TREDA) |
1300 |
Tripura Renewable–Energy |
1300 |
Uttar |
Uttar Pradesh New and |
75 |
Agricultural Department–
|
8000 |
Uttar Pradesh |
1000 |
Total |
|
1000 |
|
171070 |
|
69008 |
What is the cost distribution to establish a solar plant?
The cost distribution is as follows;
Central
and State Government |
60% subsidy |
Banks |
30% as loans to farmers |
Farmers |
10% of the actual cost |
Read More:
Business loan for women
Agriculture business plan
Dairy farm loan
Mudra Loan
Small Scale Industries in India
GST Registration Online
Aadhar Card Status
PAN Card Correction & Update
Aadhaar Card Download
PAN Card Apply Online
Instant PAN Card through Aadhaar
PAN Card Mistakes – To Avoid
How to Link Aadhaar with PAN Card
PAN Card Details Search By Name, DoB, PAN Number & Address
What is a Cancelled Cheque
KUSUM scheme FAQs:
1. When was the Kusum scheme launched?
2. How can I avail of the benefit of the Kusum scheme?
3. What is the off-grid solar system?
4. When was KUSUM scheme launched?
5. What are the main components of Kusum scheme 2021?
6. How to check the list containing registered applications under Kusum scheme?
7. How is Kusum scheme beneficial to Farmers?
8. Who will be covered under Component B of the Kusum scheme?
9. Can farmers lease their agricultural land to interested parties for the establishment of the solar power plant?

PM Kusum Scheme News
15 Horsepower Solar Pump to be provided to farmers by government
The government will provide financial assistance to the farmers for solar pumps up to 15 HP. Kusum Yojana has directed that each farmer should get Rs 2 lakh per acre of area irrigated by solar water pumps under the scheme, a statement from the water resources department said. The government also wants to make it legal for every landowner in Telangana to install 3-20 acres of the solar system on their own, as well as permitting non-tribal farmers to install up to 100 acres (1 Rai) under the same scheme.
The decision was taken at a meeting held between CM KCR and top officials at his camp office near the Osman Sagar lake on Monday evening, its release stated. The prime minister had discussed with irrigation secretary Maqbool Hossain technical matters related to water sharing during grassroots level meetings with representatives of farmers’ unions, unions of farmers organizations, and local bodies in Hyderabad on Sunday night.KCR had earlier promised that all eligible land owners would be entitled to financial assistance provided they can show proof of being able to install a solar water pump with a capacity not less than 1 HP and have it installed within one year after they get developed farmland
News Updated Date: 09th August 2022